Getting your equipment room ready is the single best way to prevent delays to your install date.
The room has the required power to support your new service.
There is enough lighting in this room to easily read a book.
There is enough extra space to add a cabinet, rack, or wall‑mount backboard, if we need one.
The temperature in this room does not get higher than 78°F (25°C).
This is a dust‑free space with ventilation.